23、On Feb.6, Xi’an – Zhenzhou High – Speed Railway, first high – speed railway in
West China, was put into operation.
A.不填;the B.the; the C.the; 不填 D.不填;不填
科目:高中英語 來源: 題型:
On Feb.6, Xi’an – Zhenzhou High – Speed Railway, first high – speed railway in
West China, was put into operation.
A.不填;the B.the; the C.the; 不填 D.不填;不填
科目:高中英語 來源: 題型:
On Feb. 6, Xi’an-Zhenzhou High Speed Railway,___________first high-speed railway in_______West China, was put into operation.
A.不填; the B.the; the C.the;不填 D.不填;不填
科目:高中英語 來源:內(nèi)蒙古赤峰市2010年高三年級統(tǒng)一考試(英語) 題型:單項填空
On Feb. 6, Xi’an – Zhenzhou High – Speed Railway,_________first high – speed railway in_______West China, was put into operation.
|
A.不填;the |
B.the; the |
C.the; 不填 |
D.不填;不填 |
科目:高中英語 來源: 題型:
On Feb. 6, Xi’an – Zhenzhou High – Speed Railway,_________first high – speed railway in_______West China, was put into operation.
A.不填;the B.the; the C.the; 不填 D.不填;不填
國際學校優(yōu)選 - 練習冊列表 - 試題列表
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)
違法和不良信息舉報電話:027-86699610 舉報郵箱:58377363@163.com